print logo
Skip to main content

Addax Okwori Phase III

Addax Okwori Phase III

Client

Subsea7

Description

The Okwori Field Development Phase III is based around a converted FPSO, the Sendje Berg, spread moored in approximately 140m of water in sector OPL 90 offshore Nigeria.

Subsea7 have been contracted to supply five off 6 inch production risers and associated flowlines, along with five off 1 ¼ inch bore gas lift integrated umbilicals, arranged in a free hanging catenary configuration.

flexlife are assisting Subsea7 in the Delivery Management of this project in terms of :

  • Review of flexible pipe design and manufacturing documentation
  • Technical support to Subsea7 for all aspects of the flexible pipe supply contract
  • Dynamic analysis of flexible riser and dynamic umbilical system to ensure the system design with the additional scope is compliant with the COMPANY requirements
 

For further information please see our Case Studies section.

System Design
Project Management
Integrity Management

Technology

We are developing products for remaining service life assessment. Our products will allow for annulus condition to be assessed in minutes rather than hours.

We will also be able to offer reliable real time riser monitoring systems. They will be simple and feed a decision matrix allowing the operator to know what to do and when immediately.

We use OrcaFlex for the system design of riser systems and associated ancillary equipment as well as dynamic installation analysis, providing in our opinion the best and most flexible software solution to our analysis requirements.

More information can be found on our Technology page.

contact icon

t: +44 1224 443300
f: +44 1224 685153
e: info@flexlife.co.uk
www.flexlife.co.uk